• AEP Building

    Robertson served as the design/build general contractor for this American Electric Power industrial truck storage facility. This LEED project included both electrical and HVAC automated systems.description 7,800 sf owner American Electric Powerarchitect Hasbrouk Engineering

    Read more

    THK
    THK

    Robertson served as general contractor for this state-of-the-art plant expansion in Hebron, Ohio. The scope of work included: Removal of existing loading dock area and development of new site.  Adding 60 ft clear span casting bays with new molten aluminum furnaces and nearly 1,000 feet of drainage trenches cast into the 8 inch thick FF50 floordescription 16,000 square foot $2,000,000 plant expansionowner THK Manufacturing of America

    Read more

    Tosoh (Cabot Corporation)

    This 90,000 square foot manufacturing and office facility was built for Cabot Thin Films, a large producer of Tantalum ingots for resale to specialized clients. This building features sloped truck docks, an entire skin made of precast concrete panels and access to major traffic corridors.description 80,000 sf manufacturing.  10,000 sf offices  $5,500,000 owner Cabot Corporationarchitect HRJL Architects, Inc.

    Read more

    Momentive (Formerly G.E. Quartz)

    This unique project included building a scrubber and environmental cleaning system. The project’s construction and installation utilized 1200+ yards of foundation concrete and more than 150 tons of structural steel to support duct work, 10ft in diameter, installed over top of an existing, operating plant.owner G.E. Quartzarchitect HWH Architects

    Read more

    Bayer Material Science

    Robertson served as general contractor for this Bayer Material Science project completed in 2007. The scope of new construction included new staff offices, new and renovated laboratory facilities and a new product showroom.description 12,300 sf addition $2,500,000 owner Bayer Corporationarchitect JBA Architect

    Read more

    Kaiser Aluminum

    Robertson has served as general contractor for numerous plant construction projects. Generally completing 6-12 projects each year within this facility. Projects have included: Truss re-builds; New furnace construction and re-builds; New machine deep foundations - some extending more than 30’ into the ground within the existing facility; Process piping and infrastructure installation and repairowner Kaiser Aluminum

    Read more